Certainty needed – why IMO must avoid phasing in of the new sulphur limit unless as a last resort for 2020
For marine engineers of a certain age, it used to be necessary to increase the electrical power available to the ship by manually synchronising the supply of an incoming generator with those already online using a series of lights. As the phases of the electrical supplies became properly aligned, the lights would flash ever more slowly, and at the right moment the engineer (with a little nervous anticipation) would close the breaker and put the generator ‘on the board’.
What has this to do with sulphur regulations, I hear you say? Well, phases and phasing in are words that may also be heard at MEPC 70 regarding introduction of the 0.5%S limit. Read more

